    【Origin Pic】

    Burr treatment sandblasting machine - endless belt type

    Burr treatment sandblasting machine, burr machine, endless belt burr sandblasting machine, burr treatment sandblasting machine

    Thermosetting Plastic Flashing Sandblaster PLASTIC DEFLASHER

    Parameters: 

    Impeller

    Impeller

    Projection amount

    Capacityof projection(kg/min)

    15

    Projection speed

    Speed ​​of projection(m/sec)

    40

    50

    60

    Number of revolutions

    Revolution(r.p.m.)

    0~2900

    0~3

    Belt(Drum)speed(m/min)Belt(Drum)speed(m/min)

    6

    Projection material circulation device

    Recycle device of projection

    Impeller self-contained

    Self sustaln Impeller

    With shaker screen

    C/W Vibrating sleve

    Additional humidification and blowing device

    With automatic atomizer and blower

    Product throughput

    Yield

    Capacity

    Capacity(ε )

    30

    25

    Weight

    Weight(kg)

    15

    10

    Length

    Max.length(mm)

    550

    Dust collectorDust collector

    Built-inConcealed type


    FEATURES:


    This is optimal automation machine specially designed for handling the burr of  the compression and injection formation of thermal hard plastic,bake lite and  resin products.

    1.The dust collector isconcealed inside the body.Optimal arrangement of operation panel for easy operation,simplemaintenance

    2.The abrasive projected by high speed revolving impeller which capable cleaning of the burr on the surface, hole,recession of the product instantly, and exerting the high cleaning efficiency. 

    3.The treated proucts are lustrous and shinning,,for this machine is equipped with automatic atomizer device and blowing evice which remove dust and dirt.

    4.This machine allow long time continue operation without part and component replaccment,so the maintenance cost is minimal and capable of   mass quantity handling,one machine is equal  to 10~15 worker, is the best mean to reduce your cost and labor.

     

    Features

     Thermosetting plastic burr treatment sandblasting machine is specially designed for the burr cleaning of thermosetting plastics, bakelite and resin products such as compression and injection molding The best machine for automation.

    1.The dust collector is hidden in the body.

      The input port and the operation panel are well arranged, easy to operate and easy to maintain.

    2. The projection material is ejected by a high-speed rotating impeller, with a large radiation area and dense projectiles. The surface of the product, inner holes, concave parts, and burrs on difficult parts can be cleaned in a short time., and exert its high-efficiency cleaning ability.

    3. After the products are processed by this machine, they are all beautiful and beautiful. Glossy.(Because this machine is equipped with automatic humidification and automatic blowing device to remove dust)

    4.This machine can be used continuously for a long time without replacing parts, so the maintenance cost is very low, and it can be processed in large quantities. Each machine can reach the production capacity of 10~15 people, which is to reduce costs and reduce labor. good helper.

     

    This machine is used to process the surface burrs of compression or injection molding thermosetting plastic products.

    Abrasive ejection is a self-contained projection device, which integrates a chassis, an endless belt conveyor, and a dust collector.

    The projection material (plastic pellets) is projected on the product through the high-speed rotating impeller, and the burrs in the form of sheets and the burrs in the recesses or holes can be removed in a short time. The size of the projected force can be adjusted to the appropriate number of revolutions on the inverter keyboard on the control panel.

    The spraying room is composed of a belt conveyor, and the rubber is all laid in the room. The input product is uniformly removed by the impact of the projection material thrown out at a high speed while the endless belt is rotating and stirring.

    The projected projection material can be used continuously through the sophisticated circulation system. The powdery burrs and the smaller projection materials are attracted and collected by the dust collector, while the larger pieces of burrs are filtered out by the screen.

    In the middle of the suction pipe, there is a nozzle for humidification. Appropriate amount of moisture can enhance the spray cleaning effect, prevent dust adhesion, and increase the life of the projection material.


    Handling Precautions
    1. The product processing time varies according to the processing volume, shape and projection material. The adjustment method is that the impeller rotation speed is between 45~60HZ (2250~3600R.P.M), and the projection time is adjusted to a good projection time, generally about eight minutes.
    2. Each wear-resistant rubber is flammable (the ignition point is about 300. C), please keep away from fireworks.
    3. Before starting the operation, please confirm whether the doors are completely closed, especially the operation door must not be opened during the blasting operation.
    4. During operation, the projection material will be slowly consumed, and the projection amount of the impeller will gradually decrease. It should be checked at the front door inspection window from time to time, or the current value of the projection ammeter can be compared. If it decreases, please add an appropriate amount.
    5. If there is abnormal sound during operation or the bearing or motor is overheated, it should be stopped immediately for inspection, and the power should be turned off to ensure safety during maintenance.
    6. Before the operation starts or after the operation, check the condition of each part. If there is any wear and tear, please repair and replace it immediately.
    7. The amount of water in the humidification bucket should be checked every day, and if it is insufficient, please add an appropriate amount.
    8. After daily operation, please stop and shake the left handle of the case a few times to shake off the dust in the dust pipe.
    9. After daily operation, please clean up debris and dust.
    10. If the rubber band is offset or slipped, please slightly adjust the adjustment screws on both sides of the chassis.
    11. Before spraying the product, please screen it, and take out the ejector rod and other sundries, and then put it into spraying, so as not to scratch the belt and prolong the life of the belt.
    12. The endless belt conveyor has a safety pin device. If the endless belt is stuck, the safety pin will automatically cut off and the endless belt will stop immediately
    To stop the rotation without damaging the machine, please take out the stuck item, then remove the chain cover and replace it with a new one.
    Full tip.
    13. Chain, bearing, please add lubricating grease twice a month.
    14. After the sponge sliver of the door is worn out, please replace it with a new one.
    15. If the nozzle for static elimination is blocked, please use a bristle brush, bamboo stick and plastic needle to clean it, and do not use a metal through needle.
    16. After use, please turn off the main switch.
    Operation Preparation
    After the machine is set up, please prepare according to the following items one by one:
    1. Connect to mains power. (Please follow the wiring shown in the P11 power supply wiring diagram)
    2. Connect compressed air source. (Nozzle blowing pressure is within 0.5kg/cm2)
    3. Prepare a bucket and add clean water or antistatic fluid.
    4. Take out the cover from the lower door on the front and put in the projection material. (Standard input is 10kg)
    5. Timer T4 for setting humidification time (depending on the size of the nozzle aperture, there are three types: ∮1.1mm, ∮0.71mm, ∮0.51mm:
    Large aperture∮1.1mm, open for 1 second and close for 15 seconds.
    Aperture ∮0.71mm, open for 1 second and close for 12 seconds,
    Small aperture∮0.51mm, open for 1 second and close for 10 seconds)
    6. Set the timer T3 of the projection time (the setting reference is 8 minutes).
    7. Set the timer T5 for the end-of-alarm waiting time (the setting reference is 2 minutes).
    8. Set the timer TR for the end of the alarm time (setting reference is 1 second).
    9. Start each drive part, and confirm the rotation direction of the motor (just make sure that the belt is rotating in the forward direction).
    Confirmation method: Press the belt forward switch, and the belt should rotate to the inside of the machine. Otherwise, please connect the R. S. T. The positions of any two of the three lines can be reversed with each other.
    After the above work is completed, please follow the operation precautions and operation sequence on the next page to start.
    Remarks: 1. The mechanical setting must consider the operation space and maintenance space.
    2. If spray-washing products with special materials, such as bakelite powder with fiber, urea, engineering plastics and other products. Because it is easy to generate static electricity, please use antistatic liquid, which can eliminate static electricity and make the surface of the product cleaner and more beautiful